Village of Bald Head Island
(910)-457-9700
(910)-457-6206

Coastal Storm Damage Reduction Project 2018

Coastal Storm Damage Reduction Project 2018

The Village is planning for a beach project in the winter of 2018-19. The project will use Jay Bird Shoals as a borrow site, with one million cubic yards of sand to be placed east of the terminal groin along South Beach. In addition, the Village will replace five geotextile tubes that are damaged beyond repair.

 

Winter project poster Revised 6

Council Regular Meeting Presentation Slides_16 MAR 2018